KEO'S KITCHEN
A.J. has a moment of silence before the cabinets are removed.
Sure didn't take A.J. very long!
My crew is now ready to being the installation, notice the sharp salute of these guys!
And how could I forget our Electrician, Jason of Amber Electric, hey how is this for a happy looking Electrician! If you want the very finest in Electrical repairs or modifications call Amber on 240-876-6540 ask for Pat or Gary.
Left picture old pipes - Right supply lines replaced. We discovered that the hot water line was leaking slightly when the wall board was removed, Keo did not realize it due to being on the 1st level and the water was just draining into the garage level. This pipe was ready to let loose!
Left Jack flexes to get ready to hang the wall cabinets - Hey he did it!
To be fair he did it with help from A.J., heck we can't give Jack all the credit!
The end of day two all cabinets are in place. Today we complete the install.
Keo & A.J.
A.J. . has his hands in his pockets again! come on A.J. back too work, Look at Action Jack! He is really getting into installing the lazy Susan.
Now there is a picture of A.J. in his normal mode.... being productive
Jack and A.J. in action.... No I have no idea of what they are doing, but they are real busy at it!
Well, the basic kitchen is installed. The next step is for the countertop vendor to measure and then fabricate the new countertop.
WHAT CAN I SAY .... THIS IS ONE GOOD LOOKING KITCHEN!
|