BATHROOM & KITCHEN REMODELING - Serving the Washington D.C. Metropolitan Area | home
SUSAN'S RENTAL PROPERTY BATH
FOLLOWS ARE SEQUENTIAL PICTURES OF SUSAN'S RENTAL PROPERTY BATHROOM. THE OLD BATHROOM WAS CONSTRUCTED IN 1953 AND ALL WALLS WERE SOLID PLASTER, THE FLOOR WAS POURED MOTOR.
FIRST SHOT EXISTING BATH, NEXT TWO SITE PROTECTION IS INSTALLED
THE TRUCK IS MADE READY TO RECEIVE THE TRASH AND THE PROJECT BEGINS
THE IST & 3RD PICTURES ARE OF THE MUD FLOOR BEING REMOVED, THIS "MUD" IS REALLY CONCRETE AND IS ABOUT 4" THICK
THE WALL TILES ARE REMOVED AND THEN THE BATHROOM IS CLEANED UP TO MAKE READY FOR THE PLUMBER
TILES ARE INSTALLED ON WALLS AND FLOOR
THE BATH IS COMPLETED - TOTAL TIME FIVE DAYS